BurhanPathan
BurhanPathan
Associate Author

rameshs

Thursday 21 Dec 17 07:08:35 PM
Repairing work halts vehicles in Anand
Repairing work halts vehicles in Anand

Anand: The repairing work at Joshikova Fatak, a railway crossing crossing between Ankalav Asor on Vadodara-Anand rail line, has been closed from 19th to 25th and repairin work is being carried out, increasing the burden of traffic on the main road connecting Vadodara-Anand. Going to Anand Vadodara, private vehicles have to go through other routes, as well as via local roads of surrounding villages.As the crossing gate is closed,  the drivers of small vehicles have adopted the driving through lifting it on  road  which can be proved to be dangerous.
 
Locals are  travelling from nearby fields up to railway  tracks with a risks of riding on motorcycles dangerously which  are charged Rs.10 from the driver. It is believed that the drivers of the vehicle are being charged on the other road, both the time and the fuel will be wasted, and therefore they will be able to cross the road by paying Rs. 10 and thus the vehicles is  lifted on the other side of the stretch from the road. There is a demand that the authorities should stop this activity otherwise it can be dangerous.